Here is the tentative list of projects:
- Add two more 100w solar panels
- Install second victron mppt charge controller for new panels
- Install quick connect for 2 more 100w suitcase style panels for shade camping
- Install 12v fan system for passive heat removal and air intake
- Meter existing HVAC and determine if solar power is feasible
- Expand battery bank to four 100 ah lifepo4 lithium batteries
- Install low wattage minisplit ac to run off solar in the desert with full panels out
- Install beefier 2000 watt inverter Xantrex prosine